Pine Haven Cox Creek Control Panel and Generator Replacement
Rehabilitation and replacement of the interiors of the existing pumpstation including the pumps, all the piping, all electrical and all HVAC and other mechanical equipment. This project included a manned 24 hour bypass operation during completion of the 8 month project. When completed the pumpstation had all new equipment inside the existing architectural structure.
Location
Pine Haven, MD
Contract Amount
1,705,802
Engineer
KCI Technologies
Owner
Anne Arundel County DPW