PFOS & PFOA WTP Upgrades – Blades WTP
This project included the installation of an addition to an existing building at the existing water treatment plant in Blades, DE. M2 relocated the existing Carbon filter that the owner owned and installed an additional new filter for PFOS and PFOA removal. The upgrade included new chemical feed systems as well as an upgraded lab/office area. M2 was challenged with constructing a new metal building to match the existing structures onsite. The mechanical and equipment installations were a success!
Location
Blades, DE
Contract Amount
1,165,471
Engineer
Davis, Bowen &Friedel. Inc.
Owner
Town of Blades