Fair Hills WTP and Piping Improvements
M2 Construction built a new Water Treatment Plant and distribution system for the DNR in Fair Hills MD at the fair grounds. The project involved construction of a new precast building and metal water tower for storage as well as new booster pumps, tanks and chemical feed to process the raw water. The existing raw water pumps were tied into the new plant and new piping was run from the existing pumps to the new plant. After the new plant was tested and put online, M2 installed a new distribution system including over 6,000 linear feet of new distribution piping. The completed project provided new water service to the entire park.
Location
Fair Hills, MD
Contract Amount
5,251,762
Engineer
Watek Engineering
Owner
Maryland Environmental Service